Tuesday, April 17, 2018

Work on the port area.

The land forms supporting the original port buildings were worked on. Most of the original buildings were at different elevations in the original port so their base heights versus their dock heights had to be accommodated by either raising or lowering the area they sit on. I also like to keep any dock that has water under it, removable to be able to keep the water surface clean. At the same time any holes where the water will be were filled. After the plaster dried a base coat of water colour was applied using dark blue and green paint. Rock castings were installed in areas between docks and sea walls. The areas under docks received a coat of plaster which was bushed horizontally to simulate rock lines. After the plaster dries it will be painted 50 shades of gray.
This is the area were the Boat repair building will sit.

Two buildings needed bases at different elevations. 

Water painted in.

No comments:

Post a Comment