Thursday, January 23, 2014

Finding Waldo Part 2

The second section will hold the turnout for the last switch back, a transfer/freight and passenger station and the siding for unloading/loading freight and passengers.  The tail track of the turnout will be on a trestle as will the track joining the two turnouts of the switch backs.
Hand laid tracks and turnout

Test fitting the pieces

Most of the lumber required for the trestle

Trestle built and installed

Station and bunk house installed

No comments:

Post a Comment