Thursday, September 20, 2012

Sawmill part 3

 With another 147 pieces of wood, a water tower, log ramp, donkey engine pad and dock, cable towers for the log unloader, have been added to the sawmill complex. Some siding and roof sections have also been added.  Now for the tedious part of cutting out the window openings.








The second picture shows the log ramp and the log unloader with attached cables,  the 2 log cars are permanent.












Another view of the log pond.  Some of the buildings siding has been added as well as some roof sections.  The water tank tower can be seen to the right of the sawmill. If you look closely you can see a log sliding down the log dump, into the log pond. Now I need 2 men with log pikes, pushing the logs around.

No comments:

Post a Comment