Flathead's Garage by Full Steam Ahead. Lazer cut wooden kit makes a nice old time garage.
Even though the real Grant's Pass never was completed, it lives on as The Grants Pass Western.
Wednesday, April 2, 2014
Tuesday, March 18, 2014
Bob's Butcher Shop
Thursday, February 20, 2014
Old Waldo Road
Added the old Waldo road to the town of Waldo. This included bridges, crossings and the station at Sailor's Diggings. The road is made of ground clay, which is glued down and the more clay is dry brushed on top to add travel marks to the surface.
| road through town |
| the road fit perfectly through the bents of the trestles |
| passing the open depot at Sailor's Diggings |
| the road through the notch |
Thursday, February 13, 2014
Happy Camp
The logging camp was moved from the old Jackpine location (now the switch back area) to Happy Camp. The kitchen had to be suspended over the river but I got most of the structures in. Then Gary sent me a picture of a lumber camp and I noticed all the slash logs on the hill side and a water tank, just what my hill side needed. So I put in a water tank and added stumps and logs to the area.
| stumps, slash and water tank added to hill side |
| all the camp buildings in place |
Friday, February 7, 2014
Cougar Ridge
Finally found some cougars at the Woodstock Train Show, and on sale too. Now I have the reason the lumber company is called Cougar Ridge, beside the fact there was a lumber company called that in the area I'm modeling
Saturday, February 1, 2014
Gary's smoked hams
Friday, January 31, 2014
Finding Waldo Part 3
The last section to be built will be the connection to the Cougar Ridge Lumber Co. Railroad main line. This will be a section of hand laid track and a trestle joining the turnout from CRLC up to the first switch back. I thought about building the two trestles at the first switch back for a while. It would have been much easier to have no trestles at all. However, there is a nice valley there and I like trestles. This also allows me to model in the old wagon road to Waldo through the valley under the trestles. It is still up in the air if the road will be still in use (bridges in the trestles) or just a few overgrown sections still visible.
| building the deck for one of the trestles |
| putting in new road bed |
| some of the ties to be glued down |
| project completed |
| trestles look good, glad I went with them |
Subscribe to:
Posts (Atom)