Thursday, December 19, 2013

Grants Pass Expansion

What was to be a small expansion yard turned out to be much different in the end. I had to extend the river, which cause problems with the track work, humm, just like in real life. But it finally took shape. The Utah Beet Sugar Co. was set in place with that track extending over the river to feed a coal dealer. Two other tracks also cross the river and form a yard that holds about ten cars.

Saturday, November 23, 2013

Thirty foot gon

I started with a department store train set gon. After taking it apart, the center section was removed, cutting along the side braces. The weight as shortened as was the under body. The parts were then reassembled and painted. Couplers and wheel sets finish the car.  It was then weathered and lettered.
original car

car taken apart

Car cut up bottom piping saved and other part not used
Car painted, weathered and lettered

Tuesday, November 5, 2013

Suckers Oyster Shack

Original building

Starting with Shuckers Oyster Shack by Full Steam Ahead, (Just one of two buildings in the kit) I added a lower section made of board and batten scale lumber sheets. A dock system and people were added to the scene along with some barrels and crates. The scene is in a back bay of Port Loleta
Added a lower section and dock to the bottom of the building

Monday, November 4, 2013

Grants Pass Station

New station area at Grants Pass. The track behind the station and the factory were removed and a water tank and shanty added.

Sunday, October 6, 2013

Log Train

After coupling to the string of log cars, Fred, the engineer eases off the brakes and sets the throttle.  The first log cars clear the bridge over Trapper's Gulch, as we enter the Eight Dollar Mountain tunnel.

We pause at Jackpine, the main camp, to take on water, and a quick coffee.


The train groans as the wheels squeal their protest rounding dead pine curve leading to the trestle over Sucker Creek.

Passing Takilma Smelter and Mill, we continue down hill.

We stop to take on water at Cave Junction

Arriving at O'Brien, we still need to shunt the cars at the Cougar Ridge Lumber Co.  Fred is looking forward to the return trip, with a string of empties, wondering what cookie has on the stove at Jackpine.

Tuesday, October 30, 2012

A staging yard was there all the time.

I was looking for a spot to store more rolling stock, can't resist buying more, and was looking at the area under Patrick Creek.  There was a double cross over, (lots of trouble with it), that lead out of Grants Pass and into the tunnel under Patrick Creek.  The main line ran in the left of this tunnel and two storage tracks (Smith River) were on the right.  The cross over allowed for continuous running, with the rail on the right being the end of the line or Smith River, everything to the left is Grants Pass.
I removed the double cross over and put in three switches. I also added a run around track (the two tracks on the upper left) to represent the town of Smith River, the cross over (bottom right) allows continuous running, everything to the right is Grants Pass. The track at the bottom right (you can just see the switch) continues on to Crescent City and Smith River, if you go straight, or to Portland and Medford (on the Southern Pacific) if you go to the right.
I am thinking about block switching both tracks at Smith River.  There would be two slots for car cards, one for the Dock and one for the West Yard of which one would always be empty, arriving cars would go to the empty track and their cards to the correct slot and all the cars on the other track and their cards would be picked up. Portland could also be switched as a block, at the start of the day, the S.P. delivers all the cars from Portland and takes all the cars for Portland back.
The tracks under Patrick Creek are, from the left, Medford, on the S.P. (more on that later) the next switch divides the main line, left you go to Portland on the S.P. or on the main line to Crescent City and Smith River (this is the middle track) the next track (the right hand side track from the Smith River run a round) is divided into two storage tracks.  So there are five tracks under Patrick Creek, Medford, Portland, the main line, Smith River Dock and Smith River West Yard. The view below shows the fascia that covers the tracks under Patrick Creek

 
The fascia was cutout, to view the tracks under Patrick Creek.  Two shelves under this opening were set up as Medford.  Cars are brought in on the front track and five finger switched to Medford (the two shelves which hold 40 cars).  Any cars going to or coming from Medford go to the Grants Pass yard.  The car cards are kept with the cars in Medford.  When you want cars from Medford, they are five finger switched to the front track and the cards are put into the box for on line cars.  I move four cars into Medford and bring back 4 cars from Medford, thus the front track is always empty, except when switching Medford. All that space had been there all along, but it is half full already.

Tuesday, September 25, 2012

Sawmill completed

Sawmill painted and weathered.  Logs and lumber piles added.  Just need some people now to finish it off.