The spar tree had to have some adjustments made to the cables and supports, to make it work with the new track alignment.
The logging road was painted into the background and the area for the drays to drop logs, was graded. While the dirt was still wet, I added ruts, from the wheels and logs, and hoof marks. Besides the spar tree and it's donkey engine, there is a barn for the dray horses, a tool shed, a canteen and a old log wagon. To the right, the first of the bunk houses can be seen. I still need to add a log rigger and his guide rope to the suspended log.
No comments:
Post a Comment