Needed a 2 track deck bridge for the mainline. Started by cutting down a standard plate bridge.
Then a piece of styrene was cut to span the gap between them. The styrene was marked for I beams.
The plate girders were cut down, and I beams added.
Strips of styrene were added to the cut down plates, and the parts were glued together.
Finished bridge was weathered and installed.
No comments:
Post a Comment