The Paving crews have been busy paving in O'Brien and Pelican Bay.
After the crossing planks were installed and covered with masking tape the road was plastered in. When it was dry the roads were painted a medium grey. A lighter grey was washed in while the medium grey was still wet, giving the roads are weathered look. Cracks and patches will be added at a later date.
No comments:
Post a Comment