The stream was drawn in and then moved to the right. This will add to foreground scenery. The house and barn areas will have another layer of ceiling put under them to create a slot for the stream to run. Nearer the track the stream will be cut into the existing tile an run under the track through a culvert or stone bridge down the level of the branch line.
Some rock castings were added at the waterfalls to create a chanel to direct the stream. |
Two layers of ceiling tiles were added to either side of the stream with a channel cut into the tile under the road bridge and railroad. The stream will continue out and under the branch line.
No comments:
Post a Comment