Thursday, March 29, 2018

Mountain building around Grants Pass.

With the new bench work completed and the basic trackwork laid, the background mountains were the next to be tackled. Old castings were fit into place and joint compound was used to fill in the gaps. While doing this, the castings fault lines and shapes were continued into the new plaster. When the plaster was almost dry a course paint brush was used to add more texture and rock stratification.  A small stream was cut into the roadbed by the coal tipple and the roadbed for the narrow gauge track to the coal mine was worked on. The deep shaft coal mine will be reworked from the old stamping plant.
 


The old stamping plant will be reworked into a coal mine.

1 comment:

  1. Boy you are motoring along well...good work Larry...George

    ReplyDelete